Grouting materials of Geopur type have been used since 1994. Since that time they have been used during hundreds of various applications by tens of application companies.

We present selected reference works performed by our company in the recent years:

  • Stabilization grouting works and anchoring of a retaining wall on highway D11 at Prague - Horní Počernice (2010)
  • Thermoinsulation of a block of flats roof (Klegova street, Hrabuvka) by application of sprayed PUR foam (2010)
  • Thermoinsulation and coating of a water tower roof at Ostrava Hladnov by combination of sprayed PUR foam layer and polyurea (2010)
  • Stabilization of a Penny market building at Frenštát pod Radhoštěm by micropiles R32 grouted with polyurethane and repair of fissures in the walls of the construction by grouting (2010)
  • Coating of underground emergency transformer pits (concrete and steel) of ČEZ Distribuce a.s. by the method of lamination and with polyurea spray (2010-2011) 
  • Stabilization and sealing grouting works at watercanal of hydro power plant HIDROIBERICA SA, Panama (2011)
  • Polyurethane underground sealing barrier to prevent contamination spreading at the laguny Ostramo site (2011) 
  • Sealing grouting works at the underground electric cable tunnel of ČEZ Distribuce R3/I at the Vítkovice a.s. site (2011)
  • Anchoring of a retaining wall at the Bata canal, Straznice (2012)
  • Sealing underground polyurethane barrier at the STIP site, Bystrice pod Hostynem (2012)
  • Foundation of Burkhardt press using grouted micropiles R32, Kovona System Cesky Tesin (2012)
  • Micropiling of foundations of school canteen at Bystrice (2012)
  • Insulation of park pond at Na Skalce, Prague 5, using Polyurea GME system (2012)
  • Remediation of soil subsidence and cavern using polyurethane grouting underneath a bike track and sidewalk, Borovskeho street, Karvina (2012)